Chalukya Nirantara
Welcome to Chalukya Nirantara is the best apartment in Koghilu. This project is located just 2.5kms from Yelhanka Koghilu junction NH-7 & 500 metres from Koghilu Busstop. Chalukya Nirantara is very close to Touche Golf Training School, Ryan International School, Reva College, Seshadripuram College and Shopping complex. Specialised hospitals like Columbia Asia is just at 9km, Srushusti Hospital is just 4km and International Airport is just 20km.
Chalukya Constructions and Developers is a promise of better homes, better futures and better communities, fluid, flexible and
futuristic, represents the shape of the future.
Specifications
Civil
• Earth quake resistant RCC framed structure
• Cement concrete solid block masonry
• All internal Wall are smoothly plastered with lime rendering
Doors & Windows
• Teak wood door frame for main Door Attractive Teak Main Door Panel Finished with melamine polish from both side and with brass Hard ware
• All Bed Room door frames will be Teak wood frame and solid Teak wood doors with melamine polish
• Balcony Door Frames will be sal Wood Frame and Shutters will be teak wood and with cut glass panes.
• All Bath Rooms and terrace doors frames will be Sal wood and waterproof plywood shutters
• Window Frames will be sal frame and Shutters will be teak wood and with cut glass panes.
• M.S guard grills for windows
• Bath Room Ventilators made of wood with translucent glass.
Flooring
• Superior quality Vitrified Flooring for Living and Dining Room.
• Vitrified Flooring for Bed Rooms and Adjacent Balcony Flooring In Ceramic tiles.
• Vitrified Flooring in kitchen
• Marble for lobby & indoor common area
Toilets
• Anti skid ceramic tiles for flooring
• Ceramic glazed wall tiles up to 7 feet
• Concealed plumbing lines
• Superior quality single lever C.P fittings (Cera Carbon, Platinum or equivalent)
• Superior quality sanitary wares (Cera Casablanca, Cruse or equivalent)
• Exhaust fan point provision
Kitchen & WorkArea
• L Shaped Granite counter with stainless steel sink with single bowl drain board
• Glazed tile dado above counter
• Provision For Aqua Guard Point.
• Washing machine point provision
• Exhaust fan point provision
Painting/Polishing
• Interior walls : Putty finished and painted with premium emulsion
• Exterior walls : Good quality exterior paint finish, weather coat or equivalent
• Ceiling : White cement finished with premium emulsion
• Enamel paint for MS grill/Bath Rooms, Balcony and Window Frames and shutters
• Main door and Bed room Doors finished with melamine polish
Electrical
• TV and telephone point in living and all bed rooms
• Modular switches of Legrand or equivalent
• Double door DB with ELCB in each apartment (Legrand or equivalent)
• Fire resistant copper wiring (Finolex or equivalent)
• Generator back up with automatic change over switch
• AC points in all bed rooms
Lift
• 1 Semi Automatic passenger Lift of 6 passenger capacity
• Spacious lift lobbies with cladding upto ceiling on lift side wall on all floors
Common Amenities
• Solar water heating system
• Landscaped gardens
• Swimming pool & kids pool
• Club house with Well Equipped health club.
Elevation
Typical Floor Plan
Ground Floor Plan
SOLD | |||||||||||||||
CHALUKYA NIRANTARA | |||||||||||||||
3 BHK | 2 BHK | 2 BHK | 2 BHK | 2 BHK | 3BHK | 3 BHK | 2 BHK | 2 BHK | 2 BHK | 2 BHK | 3BHK | Tenative Dates | |||
GROUND FLOOR | 001 | 002 | 003 | 004 | 005 | 006 | FIRST FLOOR | 101 | 102 | 103 | 104 | 105 | 106 | ||
Area | 1580 | 1235 | 1210 | 1160 | 1225 | 1530 | 1655 | 1305 | 1315 | 1260 | 1245 | 1605 | |||
Rate/sft | 2950 | 2950 | 2950 | 2950 | 2950 | 2950 | 2950 | 2950 | 2950 | 2950 | 2950 | 2950 | |||
Car park | 200000 | 200000 | 200000 | 200000 | 200000 | 200000 | 200000 | 200000 | 200000 | 200000 | 200000 | 200000 | |||
KPTCL/BWSSB | 200000 | 200000 | 200000 | 200000 | 200000 | 200000 | 200000 | 200000 | 200000 | 200000 | 200000 | 200000 | |||
PAYMENT SCHEDULE | |||||||||||||||
Total Cost | 5061000 | 4043250 | 3969500 | 3822000 | 4013750 | 4913500 | 5282250 | 4249750 | 4279250 | 4117000 | 4072750 | 5134750 | |||
On Agreement | 15% | 759150 | 606488 | 595425 | 573300 | 602063 | 737025 | 15% | 792338 | 637463 | 641888 | 617550 | 610913 | 770213 | Immediate |
On Foundation of the block | 10% | 506100 | 404325 | 396950 | 382200 | 401375 | 491350 | 10% | 528225 | 424975 | 427925 | 411700 | 407275 | 513475 | Immediate |
Basement Slab of the unit | 10% | 506100 | 404325 | 396950 | 382200 | 401375 | 491350 | 10% | 528225 | 424975 | 427925 | 411700 | 407275 | 513475 | 7th Dec 2012 |
Ground Floor Slab of the unit | 10% | 506100 | 404325 | 396950 | 382200 | 401375 | 491350 | 10% | 528225 | 424975 | 427925 | 411700 | 407275 | 513475 | 11th Jan 2013 |
First Floor Slab of the unit | 10% | 506100 | 404325 | 396950 | 382200 | 401375 | 491350 | 10% | 528225 | 424975 | 427925 | 411700 | 407275 | 513475 | 15th Feb 2013 |
Second Floor Slab of the unit | 10% | 506100 | 404325 | 396950 | 382200 | 401375 | 491350 | 10% | 528225 | 424975 | 427925 | 411700 | 407275 | 513475 | 22nd March 2013 |
Third Floor Slab of the unit | 10% | 506100 | 404325 | 396950 | 382200 | 401375 | 491350 | 10% | 528225 | 424975 | 427925 | 411700 | 407275 | 513475 | 25th April 2013 |
Brick work of the unit | 5% | 253050 | 202163 | 198475 | 191100 | 200688 | 245675 | 5% | 264113 | 212488 | 213963 | 205850 | 203638 | 256738 | 4th June 2013 |
Flooring of the unit | 10% | 506100 | 404325 | 396950 | 382200 | 401375 | 491350 | 10% | 528225 | 424975 | 427925 | 411700 | 407275 | 513475 | 18th Sep 2013 |
Painting of the unit | 5% | 253050 | 202163 | 198475 | 191100 | 200688 | 245675 | 5% | 264113 | 212488 | 213963 | 205850 | 203638 | 256738 | 17th Dec 2013 |
Handing Over | 5% | 253050 | 202163 | 198475 | 191100 | 200688 | 245675 | 5% | 264113 | 212488 | 213963 | 205850 | 203638 | 256738 | 20th March 2014 |
100% | 5061000 | 4043250 | 3969500 | 3822000 | 4013750 | 4913500 | 100% | 5282250 | 4249750 | 4279250 | 4117000 | 4072750 | 5134750 |
3 BHK | 2 BHK | 2 BHK | 2 BHK | 2 BHK | 3BHK | 3 BHK | 2 BHK | 2 BHK | 2 BHK | 2 BHK | 3BHK | ||||
SECOND FLOOR | 201 | 202 | 203 | 204 | 205 | 206 | THIRD FLOOR | 301 | 302 | 303 | 304 | 305 | 306 | ||
Area | 1635 | 1305 | 1295 | 1240 | 1240 | 1590 | 1645 | 1305 | 1300 | 1250 | 1240 | 1610 | |||
Rate/sft | 2950 | 2950 | 2950 | 2950 | 2950 | 2950 | 2950 | 2950 | 2950 | 2950 | 2950 | 2950 | |||
Car park | 200000 | 200000 | 200000 | 200000 | 200000 | 200000 | 200000 | 200000 | 200000 | 200000 | 200000 | 200000 | |||
KPTCL/BWSSB | 200000 | 200000 | 200000 | 200000 | 200000 | 200000 | 200000 | 200000 | 200000 | 200000 | 200000 | 200000 | |||
PAYMENT SCHEDULE | |||||||||||||||
Total Cost | 5223250 | 4249750 | 4220250 | 4058000 | 4058000 | 5090500 | 5252750 | 4249750 | 4235000 | 4087500 | 4058000 | 5149500 | |||
On Agreement | 15% | 783488 | 637463 | 633038 | 608700 | 608700 | 763575 | 15% | 787913 | 637463 | 635250 | 613125 | 608700 | 772425 | Immediate |
On Foundation of the block | 10% | 522325 | 424975 | 422025 | 405800 | 405800 | 509050 | 10% | 525275 | 424975 | 423500 | 408750 | 405800 | 514950 | Immediate |
Basement Slab of the unit | 10% | 522325 | 424975 | 422025 | 405800 | 405800 | 509050 | 10% | 525275 | 424975 | 423500 | 408750 | 405800 | 514950 | 7th Dec 2012 |
Ground Floor Slab of the unit | 10% | 522325 | 424975 | 422025 | 405800 | 405800 | 509050 | 10% | 525275 | 424975 | 423500 | 408750 | 405800 | 514950 | 11th Jan 2013 |
First Floor Slab of the unit | 10% | 522325 | 424975 | 422025 | 405800 | 405800 | 509050 | 10% | 525275 | 424975 | 423500 | 408750 | 405800 | 514950 | 15th Feb 2013 |
Second Floor Slab of the unit | 10% | 522325 | 424975 | 422025 | 405800 | 405800 | 509050 | 10% | 525275 | 424975 | 423500 | 408750 | 405800 | 514950 | 22nd March 2013 |
Third Floor Slab of the unit | 10% | 522325 | 424975 | 422025 | 405800 | 405800 | 509050 | 10% | 525275 | 424975 | 423500 | 408750 | 405800 | 514950 | 25th April 2013 |
Brick work of unit of theunit | 5% | 261163 | 212488 | 211013 | 202900 | 202900 | 254525 | 5% | 262638 | 212488 | 211750 | 204375 | 202900 | 257475 | 4th June 2013 |
Flooring of the unit | 10% | 522325 | 424975 | 422025 | 405800 | 405800 | 509050 | 10% | 525275 | 424975 | 423500 | 408750 | 405800 | 514950 | 18th Sep 2013 |
Painting of the unit | 5% | 261163 | 212488 | 211013 | 202900 | 202900 | 254525 | 5% | 262638 | 212488 | 211750 | 204375 | 202900 | 257475 | 17th Dec 2013 |
Handing Over | 5% | 261163 | 212488 | 211013 | 202900 | 202900 | 254525 | 5% | 262638 | 212488 | 211750 | 204375 | 202900 | 257475 | 20th March 2014 |
100% | 5223250 | 4249750 | 4220250 | 4058000 | 4058000 | 5090500 | 100% | 5252750 | 4249750 | 4235000 | 4087500 | 4058000 | 5149500 |
Pls.Note:
1. Cheque should be in the favour of : Chalukya Constructions & Developers Computation Tax, 4%
2. The Price, Terms and Super built-up area are subject to change with out prior notice Registration 6.6%
3. Customer Shall bear all applicable taxes, if any as and when imposed by the Government Legal Fee 20,000/-
4. Legal facilitation charges Rs.20,000/-
5. Stamp duty, registration, charges are approximate and extra, payable during handover.
6. All applicable taxes are payable against each installment.
Route Map
Google Map
Construction Images